*Indicative daily price for an average duration of two weeks excluding VAT, recycling, insurance (9.5%) and consumables, refer to our general conditions. – Ask for an offer or log in to your customer portal for more information.
The technical characteristics are those of the manufacturer published as an indication and subject to change. Non-contractual photo.
Multi-Purpose Basin 30m3
The combined basin with a capacity of 30 m³ provides a compact and efficient solution for treating wastewater from concrete production. By integrating a settling zone and a CO2 neutralization zone, it reduces the space required on site. This basin is ideal for handling large volumes of wastewater by separating solid substances and adjusting the water’s pH before discharge or further treatment, ensuring reliable and practical wastewater management.
Find all the details about our Solution for Water Treatment Systems on the dedicated page.
Contact us directly for any questions or requirements:
- Joel Antelo, Head of Water Protection Facilities,➔ E-Mail, ➔ 079 158 44 60
- Raphaël Wyssbrod, Water treatment Project Manager, Western Region, ➔ E-Mail, ➔ 079 233 69 14
- Renato Müller, Water treatment Project Manager, Central Region, ➔ E-Mail, ➔ 079 309 84 60
- Adrian Bächler, Water treatment Project Manager, Eastern Region, ➔ E-Mail, ➔ 079 342 53 88
Specifications
*Indicative daily price for an average duration of two weeks excluding VAT, recycling, insurance (9.5%) and consumables, refer to our general conditions. – Ask for an offer or log in to your customer portal for more information.
The technical characteristics are those of the manufacturer published as an indication and subject to change. Non-contractual photo.
Casco Insurance
Please insert more than 2 characters