*Indicative daily price for an average duration of two weeks excluding VAT, recycling, insurance (9.5%) and consumables, refer to our general conditions. – Ask for an offer or log in to your customer portal for more information.
The technical characteristics are those of the manufacturer published as an indication and subject to change. Non-contractual photo.
Settling Tank 30m3
Need to handle even larger volumes of construction wastewater? The 30 m³ IPE settling basin effectively traps solid materials like sand, gravel, cement, and sludge, while the partially purified water is either discharged into sewage pipes or neutralized if necessary. With separate settling and neutralization zones, this basin offers great operational flexibility. Multiple basins can be connected in series to manage very large volumes.
Find all the details about our Solution for Water Treatment Systems on the dedicated page.
Contact us directly for any questions or requirements:
- Joel Antelo, Head of Water Protection Facilities,➔ E-Mail, ➔ 079 158 44 60
- Raphaël Wyssbrod, Water treatment Project Manager, Western Region, ➔ E-Mail, ➔ 079 233 69 14
- Renato Müller, Water treatment Project Manager, Central Region, ➔ E-Mail, ➔ 079 309 84 60
- Adrian Bächler, Water treatment Project Manager, Eastern Region, ➔ E-Mail, ➔ 079 342 53 88
Specifications
*Indicative daily price for an average duration of two weeks excluding VAT, recycling, insurance (9.5%) and consumables, refer to our general conditions. – Ask for an offer or log in to your customer portal for more information.
The technical characteristics are those of the manufacturer published as an indication and subject to change. Non-contractual photo.
Casco Insurance
Please insert more than 2 characters