CASE STUDIES
Serrière, state road
During a railway-road project, the challenges are numerous in order to limit the interruption of railway traffic as much as possible: the evacuation and rapid transport of rubble on the railway, the adaptation to public and private roads as well as the management of high-speed lines. high voltage or overhead lines.
Providing a complete power supply at a great price
Our mission also affected the grandstands, the lighting all around the circuit and the television production infrastructure that allowed 400,000 spectators to vibrate during this memorable race.
Data Center
The Center for Temperature Control and Power System had the pleasure of working with a data center on a confidential project.
Power a television broadcast control room
A sports center contacted us for the international curling competition.
Mantain a temperature >10° for a construction site
On a building under construction, the client needed to maintain a temperature (> 10 ° C) in order to be able to lay the floor resins during the month of February on the terraces. The power and temperature control system team was able to complete these finishes and meet deadlines. The solution was to allow them to modify the heating system according to the different plans to be completed.