Mantain a temperature >10° for a construction site
On a building under construction, the client needed to maintain a temperature (> 10 ° C) in order to be able to lay the floor resins during the month of February on the terraces. The power and temperature control system team was able to complete these finishes and meet deadlines.
The solution was to allow them to modify the heating system according to the different plans to be completed.
Goal
After the technical visit to the site and an interview with the site manager, the specialists of the Thermoregulation department followed the whole project.
Duration
6 weeks
Municipality
Versoix