
Modular construction solutions
From single containers to customized solutions, the experience of our employees will allow you to bring your projects to success. By offering first-rate services, we take care of every technical aspect and direct you to the best option. Thanks to our network of partners and agencies, you will always find the right solution.
Our Advantages
Our mission is to support you in achieving your goals by providing you with the most suitable solutions to your challenges. Each project you entrust to us is unique, as are the infrastructures we create for you.
We support you in the design, preparation and turnkey installation of infrastructures perfectly suited to your needs.

Rental
Do you need containers for a limited period? Whether it is a long or short-term rental, we will always find the best option for you.

Project
We support you in the design, preparation and turnkey installation of infrastructures suited to your needs.

Sale
From Avesco Rent we offer you the possibility to buy used or new containers.

Financing
We offer Buy Back and Installment Purchase financing solutions.
Dimensions : L=6.058 W=2.438 H=2.591 mm / weight approx. 2400 Kg (depending on configuration)
Configuration: 1 insulated metal door of 40mm, PZ lock and 2 double glazed tilt and turn windows with roller shutter.
Interior height: 2.300 mm
Handling : Forklift passage 1.250mm / Slinging eyelets at the 4 corners
Exterior color: RAL 9002 Grey/White
Floor insulation: PU foam 100mm U= 0,20 W/m²K
Roof insulation: PU foam 100mm U= 0,21 W/m²K
Wall insulation: Sandwich panels with PU foam 50mm U= 0,42 W/m²K
Floor structure: 22m wood/cement panels
Floor covering: PVC 1.5 mm – grey
Ceiling: white chipboard
Interior walls: painted galvanized metal (compatible with magnets), color RAL 9002 gray/white.
Floor resistance: 2.50 kN/m2
Roof resistance: 1.50 kN/m2
Storage: stackable on 2 levels
Electrical outlets: T13 / 16A – 15 outlets per container
Lighting : 2x Double neon low consumption 36W
Heating : Electric convector 2kW
Electrical supply of the container : CEE 5-pole – 32 A – 400 V
Reversible mobile air conditioning 2600 W
Reversible heat pump air conditioner without external unit
Reinforced floor.
Insulation of the container up to U= 0,12 W/m²K
Electronic ventilation
IT pre-equipment
Choice of colors
Specific door and window according to needs
Access control solution
Sanitary installation as required
Burglar proof solution
Specific fittings and furniture
Swiss Bike Park
Swiss Bike Park: An innovative project The recently commissioned Swiss Bike Park is the largest center for mountain bike practice, training and education in Switzerland.
Reorganization of the work spaces of our head office in Puidoux.
We are taking advantage of the end of the year 2022 to expand our administrative headquarters in Puidoux. A new conference room has been built by our mobile construction department. This space is composed of 3 glass containers and contains all the equipment necessary for a good meeting. We would like to thank our teams for their precious help in moving and setting up this space in only 3 hours!
Vaux Lake
As part of a construction site, a construction company turned to our water treatment service.
New centre for animal protection in Basel
Ensuring optimum performance and safety at the same time is essential in the demolition industry.
Saint-Maurice Railway Tunnel
When working underground in complex environments such as a tunnel, it is essential to control the flow of waste by digging, loading and evacuating sandblasted materials.
Demolition of a house and recycling of materials on site
The Colas + Piasio Consortium recently contacted Avesco Rent for the demolition of an old house located in Vandoeuvre GE, in the middle of a luxury neighborhood.
Serrière, state road
During a railway-road project, the challenges are numerous in order to limit the interruption of railway traffic as much as possible: the evacuation and rapid transport of rubble on the railway, the adaptation to public and private roads as well as the management of high-speed lines. high voltage or overhead lines.
Providing a complete power supply at a great price
Our mission also affected the grandstands, the lighting all around the circuit and the television production infrastructure that allowed 400,000 spectators to vibrate during this memorable race.