Rent your equipment directly online or call us at 0848 800 044

THE FOLLOWING ACCESSORIES ARE PROVIDED WITH THIS EQUIPMENT

Casco Insurance

*Indicative daily price for an average duration of two weeks excluding VAT, recycling, insurance (9.5%) and consumables, refer to our general conditions. – Ask for an offer or log in to your customer portal for more information.

The technical characteristics are those of the manufacturer published as an indication and subject to change. Non-contractual photo.

Office 20′

or equivalent model

Quick to assemble and disassemble, with good thermal insulation and heating with convectors, they are an economical solution.

Thanks to the extreme flexibility of the system, the infinite number of combinations and the high availability, these containers can be delivered very quickly.

Available on request

Specifications

Weight
2000 kg

THE FOLLOWING ACCESSORIES ARE PROVIDED WITH THIS EQUIPMENT

Casco Insurance

*Indicative daily price for an average duration of two weeks excluding VAT, recycling, insurance (9.5%) and consumables, refer to our general conditions. – Ask for an offer or log in to your customer portal for more information.

The technical characteristics are those of the manufacturer published as an indication and subject to change. Non-contractual photo.

Storage battery

Power supply for a construction site in a rural area

Emergency Plan in Château-d’Oex

High-performance and safe heating for a chalet under renovation.

Transformation of the Matran Highway

Upgrading the entrances and exits to improve traffic flow and enhance access to industrial and commercial areas.

All-electric site

In collaboration with Ecoforce and the city of Basel
the launch of an all-electric worksite in Basel

Container installation Sisseln

We installed 32 container modules in Sisseln.
The building will serve as a living base for the duration of the construction, approximately three years.

Epoisats tunnel energy project

The Epoisats tunnel energy project accompanies the work currently underway in the Vallée de Joux.

Modular Construction

As part of the "New Axenstrasse" project, we erected two container buildings - construction site office as temporary workplace in Brunnen (SZ).

Wastewater treatment

Customized performance for the Wetzikon fire station

Office 20′
Available only on request

Earthmoving

Compaction

Aerial Platforms

Handling and lifting

Gardens & Green spaces

Professional Equipment

Modular Constructions

Power System

Temperature Control

Water Treatment