Rent your equipment directly online or call us at 0848 800 044
Water Protection Installation Avesco Rent

Wastewater treatment

Customized performance for the Wetzikon fire station

Segmentation: Emergency services

Challenge: Ensure a clean and compliant discharge of treated wastewater into the nearby stream

Results:

  • Open drainage system composed of 4 sumps (10.4 l/s per pump) leading to 2 settling basins
  • Wastewater neutralization as needed
  • Gravel bed filtration
  • Controlled discharge of treated wastewater into a stream
  • Design, proposal, and commissioning of the customized solution within 7 days
  • Continuous monitoring of quality parameters
  • Automatic alarm activation according to the alert plan in case of threshold exceedance
  • Daily remote monitoring ensured
  • Monthly cleaning and calibration of on-site probes

Equipment used:

  • 1 x SK-10 control cabin
  • 2 x XB-40 settling basins
  • 1 x XB-40 neutralization tank
  • 2 x gravel filters
  • 1 x turbidity measurement device
  • 2 x MID (magnetic inductive flow meters)
  • 4 x 400V pump controllers
41,6
l
per second treated
0
%
80% of the project carried out via rental
0
m
Project duration

On Wednesday, February 5, 2025, the inauguration ceremony of the new building for the fire department, police, and civil protection took place, located on Motorenstrasse. Excavation work is now starting (click here to see the progress).

The construction of the new building for the fire department, police, and civil protection officially began with an inauguration ceremony. The new building is being built on the municipal site of the former VZO depot. This location will allow for optimal operational logistics and strengthen synergies between emergency services.

This modern and functional building project brings together the fire department, municipal police, and civil protection under one roof, continuing to optimally provide essential services to the population while meeting the high standards of a sustainable building.

In 2023, the voters of Wetzikon clearly approved the new building. The city of Wetzikon looks forward to this future-oriented project, which is expected to be completed in 2027.

Antelo Joel
Water Protection Facilities Manager

Passionate about process engineering and environmental engineering, with a specialization in wastewater treatment, I am particularly interested in developing efficient and sustainable processes for water treatment and resource recovery. My goal is to design and optimize technical solutions that combine performance, sustainability, and economic viability.

Read all articles

Earthmoving

  • View All
  • Mini-Excavator
  • Tracked Excavator
  • Wheel Excavator
  • Wheeled Mini Dumper
  • Tracked Mini Dumper
  • Articulated Dumper
  • Mini-loader
  • Compact track Loaders
  • Articulated Wheel Loader
  • Tracked Loader
  • Bulldozer
  • Hydraulic Hammers
  • Grapples
  • Hook
  • Demolition grapples
  • Snow Equipment
  • Auger
  • Bucket
  • Accessories earthmoving
  • Mobile fuel tanks
  • Compaction

  • View All
  • Light compactors
  • Trench rollers
  • Tandem Vibratory Rollers
  • Compactor
  • Compaction fill
  • Aerial Platforms

  • View All
  • Scissor Lift
  • Vertical Shaft
  • Articulated and Telescopic Platform
  • Aerial Platform on truck
  • Tracked Platform
  • Handling and lifting

  • View All
  • Stackers and light handling
  • Rotating Telescopic Lift
  • Front Telescopic Lift
  • Forklift – Stacker
  • Gardens & Green spaces

  • View All
  • Equipment and vehicles
  • Green Care
  • Stump Grinder
  • Auger
  • Catenary
  • Branch Shredder
  • Rototiller
  • Professional Equipment

  • View All
  • Surface treatment
  • Equipment for floors and walls
  • Concrete and construction
  • Submersible Pump
  • Evacuation of materials
  • Renovation Equipment
  • Sawing – Drilling
  • Cleaning
  • Modular Constructions

  • View All
  • Office Containers
  • Stocking Container
  • Sanitary Containers
  • Ecobox
  • Access Control Container
  • Shop Container
  • Accessories
  • Power System

  • View All
  • Power generator
  • Power generator Stage V
  • Mobile storage batteries
  • Electric panels and cables
  • Compressors
  • Power generator over 100 kVA
  • Lighting
  • Load Bank
  • Tank
  • Temperature Control

  • View All
  • Hot air production
  • Hot water production
  • Cold water production
  • Air-conditioning system
  • Dehumidification
  • Ventilation
  • Water Treatment

  • View All
  • Compact Systems
  • Steering Cabins
  • Settling Tanks
  • Neutralization Basin
  • Washing Platform
  • Cleaning station