CASE STUDIES
Epoisats tunnel energy project
The Epoisats tunnel energy project accompanies the work currently underway in the Vallée de Joux.
Modular Construction
As part of the "New Axenstrasse" project, we erected two container buildings - construction site office as temporary workplace in Brunnen (SZ).
Wastewater treatment
Customized performance for the Wetzikon fire station
Construction work on the A1 between Luterbach and Härkingen
As part of the 6-lane widening of the A1 motorway, Avesco Rent - Water Protection Department is providing modern, effective solutions to ensure optimum water protection.
Fire in Bubendorf
A violent fire broke out at a factory in Bubendorf, causing an impressive column of smoke that could be seen for several kilometres.
The fire brigade quickly intervened to bring the blaze under control.